Network infrastructure change programs should always be associated with an improvement in users' perception of the quality of the service received. Before starting such a project, there are technical and commercial bid phases and evaluations that must be approved.
Once this is accomplished, the main phases are:
- Commitment.
- Operation
and administration.
- The
breakdown or transition of the network to a new project.
In the Network Deployment Services,
operations are performed in which devices are started / installed. The end
result is the contracted service. In this phase of the project there are:
1. The agreed service periods and delivery times must be respected.
2. Tools that simplify predictable bulk configuration tasks must be
available.
3. A team of specialists must supervise the installation of the devices
in a previously agreed location.
4. Validation of the entire start-up process so that the project
location can go to the operational phase.
While this list contains the obvious, it makes the network
implementation phase one of the most intense and troublesome parts of a new
scheme. This implies the not insignificant additional costs for the
commissioning of external services.
In general, the service provider or freight forwarder offers its clients
an all-inclusive package with the best possible service / price ratio. They are
expected to select device manufacturers that not only meet the technology and
economics side, but also help keep network deployment costs low.
One of the most important components for network provisioning is a
zero-touch installation service for participating devices. This means that
starting the service on the site must include:
- Customers should receive a device with basic
on-site connection instructions (similar to automatic installation of home
services like ADSL / FTTH). The customer can simply connect and turn on
their device according to the basic instructions.
- The automatic configuration process begins: the device downloads its
individual configurations from a control center and then activates them to
provide the contractually agreed service.
- The status and availability of these services
are determined from the central office (validation of the entire process).
The availability of
automatic configuration during deployment and the use of pre-validated
templates reduce installation costs by optimizing lead times and minimizing
configuration error rates.
In this phase, there
are not only advantages: maintenance procedures are significantly optimized, but
an office with a device that is out of service only has to send a new router to
start the business again. The rest of the configuration, the restoration of
saved data, etc., is carried out almost automatically through administration
tools. This facility optimizes SLAs and punishment.
In summary, automatic configuration throughout the network deployment
becomes a very relevant aspect and should always be included in the commercial
offer of the manufacturers. Not only because this represents a great improvement
in their products, but also because they can offer tools through their sales
network to reduce overall project costs and improve the perception of
service quality for their clients.
Understands this concept and integrates its software tool, the Net Manager
ColibrÃ, to manage networks. In addition to other standardized tools and
together with its WLAN and access routers, this offers optimal solutions for
schemes where your clients need them.